Capital Improvement Projects

CIP#

Title

Project Description

06-06C/R

Citywide Traffic Signal Upgrade & Management

This project is to assess the City’s traffic signals including the poles and software that controls the signals timing and lights. This assessment will provide a guide for the rehabilitation and replacement of approximately one-third of the City‘s over one hundred traffic signals. This upgrade will also provide the capacity to connect with the overall county wide traffic management plan. This project is under construction.

08-02

Greenleaf Corridor Improvements

The project consists of recreational and transportation enhancing facilities such as pedestrian and equestrian paths on Greenleaf Boulevard. The contract has been awarded.

08-10 Compton-Wilmington-Central Street Overlay This project will overlay the major roadways of Compton Boulevard, Wilmington Avenue and Central Avenue. This project is under design.

09-05

Citywide Street Lighting

This work includes modifying street lighting systems and installing new luminaires on existing poles, new electroliers, service equipment, conduit, conductors, and pull boxes Citywide. This project is under construction.

09-06

Crane Street Reconstruction

This project consists of reconstruction of sidewalk and roadways on Crane Street from Elm Street to Rosecrans Avenue Crane Street will be changed into a North Bound one-way street. Bid Results In.

09-07

Oris/Winona Alley Paving

The alley will be paved and drainage issues will be addressed. Awaiting Funding.

09-09

Williams Alley Paving

The alley will be paved and drainage issues will be addressed. This project is under design.

10-04

Fruit Town Sewer Main Replacement

This project will replace the oversized and undersized sewer pipes. This project is under design.

10-05

Willowbrook Sewer Main Replacement

This project will replace the oversized and undersized sewer pipes. This project is under design.

10-11

FY-10 Compton Bridge Rehabilitation

Bridge over the Compton Creek on Compton Boulevard will be rebuilt to prevent deterioration. This project is under design.

10-12

FY-10 Wilmington Bridge Rehabilitation

Bridge over the Compton Creek on Wilmington Avenue will be rebuilt to prevent deterioration. This project is under design.

10-18 Compton / Wilmington Area Sewer Replacement

This project will replace the oversized and undersized sewer pipes. This project is under design.

10-20 Wilmington / Alondra Area Sewer Replacement

This project will replace the oversized and undersized sewer pipes. This project is under design.

Public Works Department
205 S. Willowbrook Avenue
Compton, California 90220
(310) 605-5505
7:00 a.m. – 6:00 p.m.
Monday through Thursday

 
You are here: Home Public Works Department Capital Improvement Projects
cymbalta pharmacie 
allegra sin receta 
naltrexone mg 
nolvadex comprar online 
cymbalta generic 
hydrea comprar online 
finpecia comprar en línea 
cipro generic 
clomid venta libre 
zyban barato 
costo mestinon 
requip sin receta 
xeloda comprar en línea 
imuran sin receta 
costo wellbutrin 
    pas cher terbinafine commande proscar ibuprofen mg acheter allopurinol en ligne propecia moins cher paris terbinafine sur le comptoir prix clomid bactrim générique dulcolax mg commande vardenafil metformin générique acheter propecia en ligne phenergan prix allopurinol mg diflucan générique