|
CIP# |
Title |
Project Description |
|
06-02W |
Willowbrook Transportation Enhancement Project |
Landscape and streetscape improvements on Willowbrook Avenue from Oris Street to Greenleaf Boulevard |
|
06-06C |
Traffic Signal Upgrade & Management Citywide |
This project is to assess the City’s traffic signals including the poles and software that controls the signals timing and lights. This assessment will provide a guide for the rehabilitation and replacement of approximately one-third of the City‘s over one hundred traffic signals. This upgrade will also provide the capacity to connect with the overall county wide traffic management plan. Project is under Design. |
|
06-06R |
Traffic Signal Upgrade & Management Rosecrans |
This project will upgrade traffic signals along Rosecrans Avenue. Project is under Design. |
|
06-11 |
Safe Route to Schools |
This work is to provide improved pedestrian safety for the following schools: Longfellow Elementary (Reeve St at Central Ave.), Washington Elementary (Rosecrans Ave. at Kemp Ave), Mayo Elementary (Chester Ave. at Rosecrans Ave), Walton Middle School (Greenleaf Boulevard and Greenleaf Drive) and Roosevelt Middle (Alondra Blvd. at Burris Ave). Construction Contract has been awarded. |
|
08-02 |
Greenleaf Corridor Improvements |
The project consists of recreational and transportation enhancing facilities such as pedestrian and equestrian paths on Greenleaf Blvd. |
|
08-06 |
Northwood Ave. Reconstruction |
Street reconstruction on Northwood Avenue. Project is under design. |
|
09-05 |
Citywide Street Lighting |
Work includes modifying street lighting systems and installing new luminaires on exisiting poles, new electroliers, service equipment, conduit, conductors, and pull boxes Citywide. Project is under design. |
|
09-06 |
Crane Street Reconstruction |
Reconstruction of sidewalk and roadways on Crane Street from Elm Street to Rosecrans Ave. Crane Street will be changed into a North Bound one-way street. |
|
09-07 |
Oris/Winona Alley Paving Project |
The alley will be paved and drainage issues will be addressed. Project is under design. |
|
09-09 |
Williams Alley Paving |
The alley will be paved and drainage issues will be addressed. Project is under design. |
|
09-10 |
ARRA Pavement Rehabilitation |
This project consists of overlay grinding and sidewalk repair on Greenleaf Blvd. from Alameda St. to Central Ave.. And Santa Fe ave from Alondra Blvd. to North City limits. Construction will begin March 2010. |
|
09-12 |
ARRA Preventive Street Maintenance |
The work performed will consists in general of slurry seal, crack seal, stripping and signage of arterials at various locations. Construction will begin March 2010 |
|
09-20 |
FY Residential Sidewalk Rehabilitation |
The purpose of the project is to rehabilitate medians and sidewalks at various locations throughout the City. The project includes installation of handicap access ramps and flexible concrete to preserve trees and reduce breaks in concrete. |
|
10-01 |
Sewer System Catastrophic Failure Prevention Program |
The City’s sewer system will be inspected and analyzed to identify portions which are subject to catastrophic failure. These portions of the system will then be repaired or replaced, as appropriate. |
|
10-02 |
Rosecrans/Harris Area Sewer Replacement |
This project will replace the undersized sewer pipes. Project is under design. |
|
10-03 |
Caldwell/Northwood/Wilmington Area Sewer Replacement |
This project will replace the undersized sewer pipes. Project is under design.
|
|
10-04 |
Fruit Town Sewer Main Replacement |
This project will replace the undersized sewer pipes. Project is under design. |
|
10-05 |
Willowbrook Sewer Main Replacement |
This project will replace the undersized sewer pipes. Project is under design. |
|
10-10 |
Residential Street Overlay Project |
The work to be performed consists of overlay, grinding and sidewalk repair in ADA compliance on various residential streets. Project out to bid 2/25/10. |
|
10-11 |
FY-10 Bridge Rehabilitation |
The two bridges over the Compton Creek on Wilmington Ave and Compton Blvd will be rebuilt to prevent deterioration. |
|
10-12 |
FY 10 Compton Blvd. Street Overlay |
Overlay of a major roadway: Compton Blvd from Alameda to East City Limits |
|
10-13 |
FY 10 Wilmington Street Overlay |
Overlay of a major roadway: Wilmington Ave from Greenleaf Blvd to North City Limits. |
|
10-14 |
FY-10 Central Ave Street Overlay |
Overlay of a major roadway: Central Ave from Greenleaf Blvd to 131st St. |
Public Works Department
205 S. Willowbrook Avenue
Compton, California 90220
(310) 605-5505
7:00 a.m. – 6:00 p.m.
Monday through Thursday


